Ogden St. Networking Project
Project overview
The Ogden Street Networking Project in Menominee, Wis. and Marinette, Mich. is needed to replace and upgrade the aging existing transmission equipment, which will enhance the reliability of the local and regional electric system. The cost of the project is $17.1 million.
Project components
- Remove the foundations, transmission poles and wires east of the Interstate Bridge,
- Install new foundations, transmission poles and a 69,000-volt transmission line across the Menominee River, west of the Ogden St. Bridge,
- Make enhancements to the existing transmission poles and wires on the north and south sides of the Menominee River, and
- Upgrade the components within the Ogden Street Substation in order to accommodate the overall changes in electrical infrastructure for this project.
Project introduced to the public | Winter 2016 |
Pre-construction open house | Spring 2019 |
Construction start | Summer 2019 |
Project in service | Fall 2020 |